OIL & GAS

Petronas Gas Flare Tower in Kertih, Terengganu

SC1300 unit was used for transporting workers, tools, and all of the necessary materials up and down, when the flare top was replaced by a new one with the help of a 500-ton crane. The height of the tower is 114 m.

A special anchoring system was created to suite the tower and design calculation for the wind force and stability of Scaninter calculations and design.

Project completion 1999 (Jan -Feb)

80M PDH Tower 3003 in Kuantan, Pahang

SC1300 unit was used for transporting workers, tools, and all of the necessary materials up to 80 meters high to carry out the maintenance of the PDH 2002 tower under renovation.

Project completion 2000 (January)

Raw Water Tank in Kuantan Pahang

SC1300 model was used inside and outside the tank to carry out sand blasting and the painting of the tank in CUF site.

Project completion 1999 (Sep-Oct)

Petronas Flare Tower GPP3 in Kertih, Terengganu

Transporting workers, tools, and all of the necessary materials up and down, when the flare top was replaced.

Project completion 1999 (July)

PDH Tower / CUF site in Kuantan, Pahang

Three machines were used to transport workers, tools, and all of the necessary materials to carry out maintenance work. Scanclinber being used inside and outside the tank to carry out sand blasting and painting of the tank in CUF.

Project completion 1999 (Sep-Oct)

PDH Tower in Kuantan, Pahang

Transporting workers, tools, and all of the necessary materials to carry out maintenance work.

Project completion 1999 (Oct-Dec)

Manjung Power Plant in Perak

Transporting workers and tools for the installation of a boiler and boiler house.

Project completion 2001-2002

Petronas Gas Flare Tower in Kertih, Terengganu

A unit of SC4000 with 4.2m platform coupled with specially designed sliding platform to suit the work of replacing steam pipe line situated in the middle of the flare tower

Project completion 2003 (Jan -Feb)

Petronas Refinery in Malacca (coke drum)

Coke drum replacement of insulation

Project completion 2004 (Mar-May)

Petronas Refinery in Malacca (coke drum)

Transporting workers and tools for day-to-day work and repair of the coke drum permanent lift

Project completion 2005 - present

Optimal Chemicals Main Flare Tower Kertih,Terengganu

Project completion 2006 (Feb-Mar)

 